File:Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure.jpeg
From EGM Heritage
Size of this preview: 800 × 437 pixels. Other resolution: 2,422 × 1,322 pixels.
Original file (2,422 × 1,322 pixels, file size: 1.24 MB, MIME type: image/jpeg)
Summary
Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 16:49, 13 January 2026 | 2,422 × 1,322 (1.24 MB) | Gcook (talk | contribs) | ||
| 16:32, 13 January 2026 | Error creating thumbnail: File with dimensions greater than 12.5 MP | 4,844 × 2,644 (3.4 MB) | Gcook (talk | contribs) | Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure |
You cannot overwrite this file.
File usage
The following page uses this file: