File:Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure.jpeg

From EGM Heritage

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Original file(2,422 × 1,322 pixels, file size: 1.24 MB, MIME type: image/jpeg)

Summary

Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:49, 13 January 2026Thumbnail for version as of 16:49, 13 January 20262,422 × 1,322 (1.24 MB)Gcook (talk | contribs)
16:32, 13 January 2026
Error creating thumbnail: File with dimensions greater than 12.5 MP
4,844 × 2,644 (3.4 MB)Gcook (talk | contribs)Templeton at Assiniboine River Bridges, St. James Bridge and Interchange Project. – Templeton Engineering Co. Brochure

The following page uses this file:

Metadata