(Created page with "==Overview== The 895k long double circuit transmission line (two parallel power lines) from Gillam to Winnipeg has 3,918 guyed towers and 96 self-supporting major angle tow...")
 
No edit summary
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
==Overview==
The Nelson River HVDC Transmission Lines, also known as Bipole's I & II, are a set of 895 km long double circuit transmission lines running parallel to each other and connect the Town of Gillam in northern Manitoba to the City of Winnipeg in the south. The two combined have a total of 3,918 guyed towers and 96 self-supporting angle towers. Foundation conditions for the towers varied significantly along the route alignment for the transmission lines. Examples of the foundation conditions encountered included bedrock, deep muskeg, discontinuous permafrost, soft clays, boulder tills, and ground subject to seasonal frost heaving. The greatest challenges with respect to the design of the tower foundations involved the discontinuous permafrost and adfreeze forces.
 
The 895k  long double circuit transmission line (two parallel power lines) from Gillam to Winnipeg has 3,918 guyed towers and 96 self-supporting major angle towers. Foundation conditions were rock, deep muskeg, discontinuous permafrost, soft clays, boulder tills and ground subject to seasonal frost heave. The discontinuous permafrost and adfreeze forces were the greatest challenge.  


==Where==
==Where==
The southern 530k through the Interlake has level terrain containing few large swamps. Limestone bedrock varies from surface to in excess of 15m. The predominant soil is glacial till with boulders, and silts and clays. Some sands and artesian flow conditions occur.
[[File:BiPole Routing.jpg|thumb|Figure 1: BiPole I & II Routing]]


The northern 365k is in the Precambrian Shield characterized by widely varying granite rock, deep muskegs, and extensive peat lands. The soils vary from hard glacial till to very soft silty clays and intermittent submerged sand deposits. This section lies within the intermittent permafrost zone: with sporadic permafrost in the south starting near the north end of Lake Winnipeg; to widespread in the north near Kettle Rapids and Gillam.
The southern portion of the transmission corridor is 530 km in length and runs through the Interlake region of Manitoba between Lake Winnipeg, Lake Manitoba and Lake Winnipegosis. The soil conditions in this area predominantly consists of flat level terrain with relatively few swampy areas. The limestone bedrock beneath the soils typically varies from being at the surface to in excess of 15 m down. The predominant soil in the area is glacial till with boulders, silts, and clays. Some sands and artesian flow conditions occur.


The ground conditions within a tower vary considerably and it is not unusual to have four anchors of the guyed towers in different sub-surface conditions.
The northern portion of the transmission corridor is 365 km in length and runs through the Canadian shield (Precambrian bedrock). This terrain is characterized by rugged granite rock, deep muskeg, and extensive peat lands. The soils vary from hard glacial till to very soft silty clays and intermittent submerged sand deposits. This section of the transmission corridor lies within an intermittent permafrost zone, which is characterized by sporadic permafrost in the south near the north end of Lake Winnipeg to widespread permafrost in the north near Kettle Rapids and the Town of Gillam. The ground conditions can vary so significantly that within a single tower it is not unusual to have four anchors of a guyed tower within four different sub-surface conditions.


==When==
==When==
Concept, Terrain analysis, route selection 1966
*Concept, terrain analysis & route selection - 1966
 
*Anchor tests – 1966 to 1968
Anchor tests – 1966 - 1968
*Surveys and geotechnical – 1967 to 1969
 
*Design – 1967 to 1969
Surveys and geotechnical – 1967 to 1969
*Construction - 1968 to 1970
 
Design – 1967 to 1969
 
Construction - 1968 to 1970


==Research==
==Research==
The size and importance of the project justified more than the usual amount of research principally related to permafrost and adfreeze forces.
The relative size and importance of the HVDC project justified a meaningful amount of research going into its design, principally related to permafrost and adfreeze forces.
 
Extensive laboratory testing, analytical studies, and literature reviews were carried out to obtain basic data on the engineering properties of thawed permafrost soils, rates of regression of the permafrost table, and the nature and extent of settlements resulting from thawing. Close liaison was maintained with the National Research Council of Canada and the U. S. Army Material Command’s Cold Regions Research and Engineering Laboratory. Pioneering work from the U.S.S.R. was also used.


Extensive laboratory testing, analytical studies, and literature reviews were carried out to obtain basic data on the engineering properties of thawed permafrost soils, rates of regression of the permafrost table and the nature and extent of settlements resulting from thawing. Close liaison was maintained with the National Research Council of Canada and the U. S. Army Material Command’s Cold Regions Research and Engineering Laboratory. Pioneering work in the U.S.S.R. was also used.
Part of the research and design process included an extensive anchor testing program which was carried out by Manitoba Hydro at several sites representing various soil conditions. The anchors tested included grouted, belled, screw-in, plate, and Malone types. On behalf of Atomic Energy of Canada, Teshmont Consultants conducted additional anchor testing programs including tests on overburden drilled anchors and driven pile anchors. In addition they conducted a series of detailed field tests to determine the behavior of straight shaft and belled cast-in-place concrete anchors in thawed permafrost affected ground. In total twenty anchors were installed in the permafrost and the ground was thawed by means of rod type electric heaters. The anchors were then tested to failure. The behavior of the anchors under anticipated thawing conditions was predicted to within an acceptable degree of accuracy.


Extensive anchor test programs were carried out by Manitoba Hydro at several sites representing various soil conditions. The anchors tested included grouted, belled, screw-in, plate and Malone types. Teshmont Consultants conducted, for the Atomic Energy of Canada Limited, additional anchor test programs including tests on overburden drilled anchors, driven pile anchors and a series of detailed field tests to determine the behavior of straight shaft and belled cast-in-place concrete anchors in thawed permafrost affected ground. Twenty anchors were installed in permafrost and the ground was thawed by means of rod type electric heaters. The anchors were then tested to failure. The behavior of the anchors under anticipated thawing conditions was predicted within an acceptable degree of accuracy.
[[File:Tower Cross Section.jpg|thumb|Figure 2: Tower Cross Sections ]]


==Permafrost==
==Permafrost==


The permafrost occurs in area from a few square metres to several acres and in depth from less than 3m to 30m or more, in no set pattern. The frozen soils are silty clays containing ice inclusions and lenses up to 300mm thick. Ground temperature in the upper layers is -1C to 0C. Studies indicated the ground will not remain frozen. In the frozen state the soils have substantial pullout resistance. In the thawed state the soil is transformed into a fluid structure with a drastic reduction in strength and consolidation results in large settlements.
Permafrost can occur in areas as small as a few square meters to as large as several acres. The depth of the permafrost varied from less than 3 m deep to more than 30 m, in no particular set pattern. The frozen soils contained within permafrost are typically silty clays containing ice inclusions and lenses up to 300 mm thick. Ground temperature in the upper layers is -1C to 0C. Studies indicated the impacted areas will not remain frozen. In the frozen state the soils have substantial pullout resistance. However, in the thawed state the soil is transformed into a fluid like structure with a drastic reduction in strength, and consolidation results in large settlements.


The rate of regression of the permafrost table was estimated based on one dimensional heat transfer. Five idealized soil profiles were analyzed.
The rate of regression of the permafrost table was estimated based on one dimensional heat transfer. Five idealized soil profiles were analyzed.
Line 37: Line 34:
==Frost Forces==
==Frost Forces==


Frost heave and adfreeze forces were computed by an empirical approach described by N. A. Tsytovich and field and laboratory testing by Dalmatov and Vyalov. The average force of 96 kPa  over 1.8m was compared to observations by Crory in Alaska and the U.S.S.R. permafrost design manual.  
Frost heave and adfreeze forces were computed by an empirical approach described by N. A. Tsytovich with field and laboratory testing done by Dalmatov and Vyalov. The average force of 96 kPa  over 1.8 m was compared to observations by Crory in Alaska and the U.S.S.R. permafrost design manual. Reducing the forces by granular backfill or providing a slip surface was rejected due to high water tables and maintenance difficulty.
Reducing the forces by granular backfill or providing a slip surface was rejected due to high water table and difficult maintenance.


==Designs==
==Designs==
The legs of self supporting towers and the masts of the guyed towers are supported on spread type footings consisting of a galvanized steel framework on a treated timber pad. For the 190k section south from Gypsumville the masts of the guyed towers are supported on 1.07m by 3.35m deep concrete caissons.
The legs of self supporting towers and the masts of the guyed towers are supported on spread type footings consisting of a galvanized steel framework on a treated timber pad. For the 190 km section south from Gypsumville the masts of the guyed towers are supported on 1.07 m by 3.35 m deep concrete caissons.


The 150mm overburden drilled type of anchor was chosen as the most versatile and economic system. The maximum drilling depth was initially 15m. In the soft clays and permafrost 400 – 450mm diameter anchors were installed in 1969. This system was slow and costly and drilling equipment was improved to advance the 150mm system to 24.4m.  
The 150 mm overburden drilled type of anchor was chosen as the most versatile and economic system. The maximum drilling depth was initially 15 m however, in soft clays and permafrost 400–450 mm diameter anchors were installed utilized (1969). This system was slow and costly and drilling equipment was improved to advance the 150mm system to 24.4m.  
                        
                        
Approximately 8000 anchors were tested and 150 required corrective measures consisting of an anchor of greater length or a second anchor with a yolk.     
Approximately 8000 anchors were tested and 150 required corrective measures consisting of an anchor of greater length or a second anchor with a yolk.     
<gallery heights=400px widths=400px>
File:Foundation Cross Section.jpg|Figure 3: Foundation Cross Section
File:OB Drill.jpg|Photo 1: OB Drill
File:Anchor Cross Section.jpg|Figure 4: Anchor Cross Section
File:Testing Guy Anchors at Structure.jpg|Photo 2: Testing Guy Anchors at Structures
</gallery>


==Stories==
==Stories==
In the 1970’s ID Engineering Company, one of the founding members of Teshmont, supported research into adfreeze forces at the University of Manitoba. A 2.4m steel tank was fitting with refrigeration equipment to freeze soils with embedded structural members and measure forces.
In the 1970’s ID Engineering Company, one of the founding members of Teshmont, supported research into adfreeze forces at the University of Manitoba. A 2.4 m steel tank was fitting with refrigeration equipment to freeze soils with embedded structural members and measure forces.


Shortly after construction a number of mast support quadruped legs were bent and the top cap was torn at the corner weld by the block of frozen soil rising within the sloping legs. The soil was replaced by a Styrofoam block.
Shortly after construction, a number of mast support quadruped legs were bent and the top cap was torn at the corner weld by the block of frozen soil rising within the sloping legs. The soil was replaced by a Styrofoam block.


Also within a few years a number of spread footings experienced excessive settlement that was corrected during maintenance.
Also, within a few years a number of spread footings experienced excessive settlement that was corrected during maintenance.


==Influence==
==Influence==
The Nelson River Transmission Line is an innovative, successful facility that brings 75% of Manitoba power to southern Manitoba and for export.
The Nelson River Transmission Lines are an innovative, successful facility that brings 75% of Manitoba power to southern Manitoba and for export.


==Key players==
==Key players==
 
 
Client – AECl/Manitoba Hydro:
Client – AECL/Manitoba Hydro:
Harry Smith P. Eng., AECL
*Harry Smith P. Eng., AECL
Gordon E. McLure P. Eng, Manitoba Hydro
*Gordon E. McLure P. Eng, Manitoba Hydro


Designers/Engineers/Geoscientists  
Designers/Engineers/Geoscientists:
Ilmar Reinart P. Eng., Teshmont Consultants Ltd.
*Ilmar Reinart P. Eng., Teshmont Consultants Ltd.
A. Staudz P. Eng., Teshmont Consultants. Ltd.
*A. Staudz P. Eng., Teshmont Consultants. Ltd.
Larry Hurwitz P. Eng., Independent Testlabs Ltd.
*Larry Hurwitz P. Eng., Independent Testlabs Ltd.
Jack Mollard P. Eng., J. D. Mollard & Associates
*Jack Mollard P. Eng., J. D. Mollard & Associates


==References==
==References==


Nelson River Transmission Line - Foundation Design Aspects. I. Reinart P. Eng. Project Engineer – Foundations, Teshmont Consultants Ltd. Manitoba Power Conference EHV – DC Winnipeg. Canada. June 7-10, 1971
Nelson River Transmission Line - Foundation Design Aspects. I. Reinart P. Eng. Project Engineer – Foundations, Teshmont Consultants Ltd. Manitoba Power Conference EHV – DC Winnipeg. Canada. June 7-10, 1971

Latest revision as of 20:52, 27 April 2016

The Nelson River HVDC Transmission Lines, also known as Bipole's I & II, are a set of 895 km long double circuit transmission lines running parallel to each other and connect the Town of Gillam in northern Manitoba to the City of Winnipeg in the south. The two combined have a total of 3,918 guyed towers and 96 self-supporting angle towers. Foundation conditions for the towers varied significantly along the route alignment for the transmission lines. Examples of the foundation conditions encountered included bedrock, deep muskeg, discontinuous permafrost, soft clays, boulder tills, and ground subject to seasonal frost heaving. The greatest challenges with respect to the design of the tower foundations involved the discontinuous permafrost and adfreeze forces.


Where

Figure 1: BiPole I & II Routing

The southern portion of the transmission corridor is 530 km in length and runs through the Interlake region of Manitoba between Lake Winnipeg, Lake Manitoba and Lake Winnipegosis. The soil conditions in this area predominantly consists of flat level terrain with relatively few swampy areas. The limestone bedrock beneath the soils typically varies from being at the surface to in excess of 15 m down. The predominant soil in the area is glacial till with boulders, silts, and clays. Some sands and artesian flow conditions occur.

The northern portion of the transmission corridor is 365 km in length and runs through the Canadian shield (Precambrian bedrock). This terrain is characterized by rugged granite rock, deep muskeg, and extensive peat lands. The soils vary from hard glacial till to very soft silty clays and intermittent submerged sand deposits. This section of the transmission corridor lies within an intermittent permafrost zone, which is characterized by sporadic permafrost in the south near the north end of Lake Winnipeg to widespread permafrost in the north near Kettle Rapids and the Town of Gillam. The ground conditions can vary so significantly that within a single tower it is not unusual to have four anchors of a guyed tower within four different sub-surface conditions.

When

  • Concept, terrain analysis & route selection - 1966
  • Anchor tests – 1966 to 1968
  • Surveys and geotechnical – 1967 to 1969
  • Design – 1967 to 1969
  • Construction - 1968 to 1970

Research

The relative size and importance of the HVDC project justified a meaningful amount of research going into its design, principally related to permafrost and adfreeze forces.

Extensive laboratory testing, analytical studies, and literature reviews were carried out to obtain basic data on the engineering properties of thawed permafrost soils, rates of regression of the permafrost table, and the nature and extent of settlements resulting from thawing. Close liaison was maintained with the National Research Council of Canada and the U. S. Army Material Command’s Cold Regions Research and Engineering Laboratory. Pioneering work from the U.S.S.R. was also used.

Part of the research and design process included an extensive anchor testing program which was carried out by Manitoba Hydro at several sites representing various soil conditions. The anchors tested included grouted, belled, screw-in, plate, and Malone types. On behalf of Atomic Energy of Canada, Teshmont Consultants conducted additional anchor testing programs including tests on overburden drilled anchors and driven pile anchors. In addition they conducted a series of detailed field tests to determine the behavior of straight shaft and belled cast-in-place concrete anchors in thawed permafrost affected ground. In total twenty anchors were installed in the permafrost and the ground was thawed by means of rod type electric heaters. The anchors were then tested to failure. The behavior of the anchors under anticipated thawing conditions was predicted to within an acceptable degree of accuracy.

Figure 2: Tower Cross Sections

Permafrost

Permafrost can occur in areas as small as a few square meters to as large as several acres. The depth of the permafrost varied from less than 3 m deep to more than 30 m, in no particular set pattern. The frozen soils contained within permafrost are typically silty clays containing ice inclusions and lenses up to 300 mm thick. Ground temperature in the upper layers is -1C to 0C. Studies indicated the impacted areas will not remain frozen. In the frozen state the soils have substantial pullout resistance. However, in the thawed state the soil is transformed into a fluid like structure with a drastic reduction in strength, and consolidation results in large settlements.

The rate of regression of the permafrost table was estimated based on one dimensional heat transfer. Five idealized soil profiles were analyzed.

Frost Forces

Frost heave and adfreeze forces were computed by an empirical approach described by N. A. Tsytovich with field and laboratory testing done by Dalmatov and Vyalov. The average force of 96 kPa over 1.8 m was compared to observations by Crory in Alaska and the U.S.S.R. permafrost design manual. Reducing the forces by granular backfill or providing a slip surface was rejected due to high water tables and maintenance difficulty.

Designs

The legs of self supporting towers and the masts of the guyed towers are supported on spread type footings consisting of a galvanized steel framework on a treated timber pad. For the 190 km section south from Gypsumville the masts of the guyed towers are supported on 1.07 m by 3.35 m deep concrete caissons.

The 150 mm overburden drilled type of anchor was chosen as the most versatile and economic system. The maximum drilling depth was initially 15 m however, in soft clays and permafrost 400–450 mm diameter anchors were installed utilized (1969). This system was slow and costly and drilling equipment was improved to advance the 150mm system to 24.4m.

Approximately 8000 anchors were tested and 150 required corrective measures consisting of an anchor of greater length or a second anchor with a yolk.


Stories

In the 1970’s ID Engineering Company, one of the founding members of Teshmont, supported research into adfreeze forces at the University of Manitoba. A 2.4 m steel tank was fitting with refrigeration equipment to freeze soils with embedded structural members and measure forces.

Shortly after construction, a number of mast support quadruped legs were bent and the top cap was torn at the corner weld by the block of frozen soil rising within the sloping legs. The soil was replaced by a Styrofoam block.

Also, within a few years a number of spread footings experienced excessive settlement that was corrected during maintenance.

Influence

The Nelson River Transmission Lines are an innovative, successful facility that brings 75% of Manitoba power to southern Manitoba and for export.

Key players

Client – AECL/Manitoba Hydro:

  • Harry Smith P. Eng., AECL
  • Gordon E. McLure P. Eng, Manitoba Hydro

Designers/Engineers/Geoscientists:

  • Ilmar Reinart P. Eng., Teshmont Consultants Ltd.
  • A. Staudz P. Eng., Teshmont Consultants. Ltd.
  • Larry Hurwitz P. Eng., Independent Testlabs Ltd.
  • Jack Mollard P. Eng., J. D. Mollard & Associates

References

Nelson River Transmission Line - Foundation Design Aspects. I. Reinart P. Eng. Project Engineer – Foundations, Teshmont Consultants Ltd. Manitoba Power Conference EHV – DC Winnipeg. Canada. June 7-10, 1971